By reverse engineering and remanufacturing critical turbine parts, we were able to reduce lead times and improve operational reliability for an oil sands plant.
Read our latest case study to see how one of our partners in the oil and gas industry saved over $330,000 by reconditioning conveyor bearings for their ore processing plant.
During a scheduled shutdown, a cement manufacturer requested borescope inspections on their site gear reducer. See how rapid repairs and seamless coordination from our team produced quality results.
Searching for an improved lubrication maintenance program, a yogurt manufacturer contacted our team. Now, this manufacturer utilizes our custom lubrication system to simplify oil storage and organization facility-wide.
When a hot-rolled steel mill sought to reduce downtime and repair costs associated with varying spline profiles used across its rolling mill stands, our team was ready to tackle the challenge.
When a leading steel tube manufacturer faced critical challenges seeking to replace aging stand slide couplings, our team was more than ready to assist.