Case Study: Hydraulic Pressure Unit Redesign for Ore Processing Plants in the Oil & Gas Industry
May 5, 2025
Case Study: Supporting Equipment Reliability and Engineering Improvements
June 30, 2025Background: Maintaining Critical Turbine Operations
An oil sands plant, originally built in the late 1970s, relies on dozens of steam turbines that are critical to various process systems used to upgrade raw bitumen into oil and other byproducts. These turbines are essential to two of the three cokers, which are at the heart of plant operations.
A failure of both the primary and redundant turbines on any process line could reach several million dollars per day in lost revenue. This does not include the additional costs of an unscheduled maintenance shutdown that such an event may require, making turbine reliability a top priority.
The Challenge: Aging Equipment and Long Lead Times
Due to the age of these turbines, parts for the specific models are no longer manufactured. The customer’s existing supplier was taking three to four months just to provide quotes for replacement parts, with excessively long lead times for delivery.
The nature of these components requires strict adherence to OEM specifications and rigorous QA/QC standards. Any downtime of these turbines has a ripple effect on related process systems, further emphasizing the need for timely and reliable solutions.
Our Solution: Innovative Sourcing and Remanufacturing
Leveraging internal expertise and industry partnerships, our team developed a unique approach to address the customer’s challenges:
Sourcing Decommissioned Turbines:
- We began sourcing decommissioned turbines and harvesting the required parts for remanufacturing.
- Using the latest machining techniques, we ensured that remanufactured parts met or exceeded original specifications.
- For parts that could not be sourced, we reverse-engineered components to manufacture them from scratch, maintaining strict QA/QC standards.
- This innovative approach allowed us to offer remanufactured parts and components with significantly reduced quoting and delivery timelines.
Results: Improved Reliability and Customer Confidence
- Increased Reliability: Our remanufactured parts met or exceeded OEM specifications, ensuring reliable turbine performance.
- Superior Speed: The customer gained access to critical parts and components in a fraction of the time compared to their previous supplier.
- Growing Confidence: As the customer gained confidence in the quality and performance of the remanufactured parts, demand for these solutions increased.
- Future Considerations: The customer is now exploring complete turbine rebuilds for plug-and-play options, further solidifying our partnership.